The Project’s Guiding Question

How does sleep affect the way our bodies and brains work, and what does our own school’s sleep data tell us?

Project Overview

Students investigate sleep as a biological process and then run a real study on their own school.


They start by learning what happens in the body and brain during sleep. Then they design a sleep census, recruit volunteers from across the school, and collect data over several weeks. The project teams are the research team. Everyone else is a participant.


Throughout the project, students act as young biological researchers. They design the instrument, recruit the school, manage the data, analyze the results, and report back to the community that provided them with the data.

Final Product

Students produce two things.

  1. The School Sleep Report: A research brief presenting the census findings: the research questions, the method, the participation rate, the data, the biology behind the patterns, the limits of the study, and evidence-based recommendations for the school.
  2. The Results Reveal: A public event where the school gets its findings back. The people who logged their sleep see what the data showed. A study that takes data from a community and never reports back to it has failed at something important.

The report should include:

Learning Goals

Students will:

The Challenge

Students are expected to think like biological researchers, and not like people who simply give advice.

Running a study on real people introduces problems a classroom experiment never does. People forget to log or join late. People answer what sounds good, instead of what is true. Every one of those problems is part of the science, and the report has to address them.

Students should understand that sleep connects systems. The brain consolidates memory. Hormones regulate growth, appetite, and stress. Light exposure sets the circadian clock. Screens, homework, sports, part-time work, and school start times all press on that biology.

When running the census, students should continually ask:

One rule shapes the entire project. Students observe sleep. They do not manipulate it. Nobody is asked to sleep less, stay up later, or change their habits for the study. Participants log their normal lives. This is not a limitation to work around. It is how human research ethics work, and understanding that boundary is part of the science.

The PBL Recipe

Ingredients

01

Initiate

Students explore what sleep is and why every animal does it. They study sleep stages, circadian rhythms, melatonin and cortisol, and what the brain does at night.

They examine the gap between what teenagers biologically need and what teenagers actually get, and discuss the reasons behind it.

Every student in the project keeps a personal sleep log for one week. This is the pilot. They will discover firsthand that logging is annoying, that they forget, and that some questions are hard to answer honestly. This experience shapes the instrument they design in the next phase.

The phase ends with a Project Kickoff. Teams choose a research angle:

Each team pitches its question and explains what data would answer it.
02

Plan

This is where the census gets built and the volunteers sign up.

Design the instrument: The whole school fills in the same core log. If teams each use their own version, the data cannot be combined. The core log must take under one minute each morning:

Each team may add a maximum of two questions of its own. The core stays identical for everyone.

Set up the channel: One digital form with a QR code, plus a paper option for students without phones. Teams test it on twenty people and fix what breaks before going wider.

Protect anonymity: No names. Each participant creates a code they can reproduce daily without writing it down, for example the first two letters of a parent’s first name plus their own day of birth. The code links a person’s entries to each other without identifying them. Consent forms go to families before recruitment, handled by the teacher.

To be included in the analysis, a participant needs at least 7 logged nights inside the window. Late joiners are tagged as a second cohort. Comparing them to the day-one joiners is itself a finding worth reporting.

Recruit the volunteers: This is the make-or-break task of the phase. A weak recruitment means a weak dataset, and no amount of good analysis fixes that later.

Recruitment runs as a campaign, not an announcement:

One team should own recruitment and data quality for the whole census. That job is bigger than it sounds.

Each team also writes a work plan with roles, deadlines, ethical guidelines, and success criteria, including a target participation number.

03

Execute

Monitoring and reporting: Participants log daily for 21 days. Intake stays open for the first 10. Participation will drop - it’s natural. Planning for it is essential:

Teams monitor the incoming data continuously. If a question is being skipped or answered strangely, they note it. That goes in the report as a method finding.

Analysis: After day 21, the data closes. Teams clean the dataset, exclude entries below the 7-night minimum, and check for impossible or duplicated responses.

They analyze their own question against the shared data, using tables, graphs, and visual summaries.

Then they connect patterns to biology. A pattern is not a finding until they can explain the mechanism or state clearly that they cannot do so.

Teams also examine their own sample. How many students participated out of how many were invited. Which grades are overrepresented. Who dropped out and when. Whether the late cohort differs from the early one. These numbers go in the report.

04

Deliver

The students write the School Sleep Report and prepare the Results Reveal.

The report presents the questions, method, participation numbers, findings, biology, limits, and recommendations.

Recommendations must be specific and workable. “Sleep more” is not a recommendation. A proposal about assembly timing, homework distribution before test weeks, or a screen-curfew campaign built from the data – are valid recommendations.

The event preparation is a project of its own. Teams handle:

Teams should be ready to defend their method and to say plainly where their evidence is thin.
05

Close

The Results Reveal: The school gets its data back.

Recommend a pajama dress code for the event. Pajamas, slippers, a pillow if the room allows it. This is not decoration. It signals that this is the school’s own study coming home, lifts attendance, and it makes an event about biology feel like it belongs to everyone in the building.

Teams present the participation numbers, main findings and biology behind them, limits of the study, and recommendations. They take questions from the audience, including from the participants themselves.

Close the event by handing the recommendations to the people who can act on them.

Reflection: After the event, students reflect on the science and on the experience of running a real study. What surprised them. Where the data contradicted their expectations. What they would redesign in the instrument. How their own habits look to them now.

They also face the harder question. Knowing what the biology says is not the same as changing behavior, and getting people to participate turned out to be harder than getting the science right. What would actually have to change, at home or in the school, for their recommendation to work?

Final Dish

A wide-awake set of recommendations, built from the school’s own sleep data and handed back to the people who lost sleep collecting it.

Serves

Students who are ready to stop hearing about sleep and start running the study.

Bon Appétit!